Central Vigilance Commission (CVC)
CVC is the nodal agency which mandates how tendering should be done such that Transparency is maintained. From time to time it issues guidelines as how the tendering process should be carried out. Some of the guidelines issued in past by CVC are listed below.
"It is needless to state that tendering process or public auction is a basic requirements for the award of contract by any Government agency as any other method, especially award of contract on nomination basis, would amount to a breach of Article 14 of the Constitution guaranteeing right to equality, which implies right to equality to all interested parties."
# Guidelines for Selection of eProcurement Service
Earlier Government use to select eProcurement service provider on ad hoc basis, and hence CVC had made it mandatory w.e.f. 1st Jan 2009 as per guidelines, that a proper tender should be floated even for selection of eTendering, eProcurement service provider. Order copy can be viewed on http://www.cvc.nic.in/E-tendersol.pdf
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
# Guidelines for Time Bound Processing of Tender
Many a times, tender are not awarded on time, which results in cost escalation. Taking note of this, CVC has issued orders to ensure that tenders are opened, evaluated & awarded as per the time specified in the Tender document to avoid cost escalation as per order the following order http://tender-tiger.blogspot.com/2009/02/central-vigilance-commission.html dated 6th Nov, 2008
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
# Guidelines for adoption of Integrity Pact within Government.
To enhance transparency in government procurement, CVC has recommended adoption of Integrity Pact in all PSU except banks in view of their limited procurement. Though it is now optional, CVC recommends that it initiatives should be taken to adopt is & once adopted it should not be discontinued as per order http://www.cvc.nic.in/007vgl0330808.pdf dated 5th August, 2008
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
# Acceptance of Bank Guarantee
Many a times, contractors submit fake/counterfeit Bank Guarantee and Government has no mechanism to check it. To curb this menace, CVC has asked Government to ensure that Banks send them the Original Bank Guarantee Directly through Regd. Post or at least duplicate copy to Government in cases where Original BG is not possible to post as per order dated 1st Jan, 2008 http://cvc.nic.in/010108.pdf
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
# Making Tendering process Mandatory for all Government Organisation
As per CVC award of contract on nomination basis, would amount to a breach of Article 14 of the Constitution guaranteeing right to equality, which implies right to equality to all interested parties and hence it has made Tendering mandatory for all Government Organizations.Only is cases of Natural Calamity, it can be avoided. Refer order no. dated 5th July, 2007 http://cvc.nic.in/OfficeOrderNo23-7-07.pdf
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
# Guidelines as how procurement can be improved in Government
a detailed document is issued by CVC detailing each and every step of Tendering which is available on http://cvc.nic.in/cte_man_2002.pdf
a must read document for all Purchase / Procurement Managers
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
# CVC disallows negotiation with L1
As post tender negotiations could often be a source of corruption, it is
directed that there should be no post-tender negotiations with L-1,
except in certain exceptional situations. To view the order copy click http://cvc.nic.in/005crd012.pdf
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
CVC is the nodal agency which mandates how tendering should be done such that Transparency is maintained. From time to time it issues guidelines as how the tendering process should be carried out. Some of the guidelines issued in past by CVC are listed below.
"It is needless to state that tendering process or public auction is a basic requirements for the award of contract by any Government agency as any other method, especially award of contract on nomination basis, would amount to a breach of Article 14 of the Constitution guaranteeing right to equality, which implies right to equality to all interested parties."
# Guidelines for Selection of eProcurement Service
Earlier Government use to select eProcurement service provider on ad hoc basis, and hence CVC had made it mandatory w.e.f. 1st Jan 2009 as per guidelines, that a proper tender should be floated even for selection of eTendering, eProcurement service provider. Order copy can be viewed on http://www.cvc.nic.in/E-tendersol.pdf
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
# Guidelines for Time Bound Processing of Tender
Many a times, tender are not awarded on time, which results in cost escalation. Taking note of this, CVC has issued orders to ensure that tenders are opened, evaluated & awarded as per the time specified in the Tender document to avoid cost escalation as per order the following order http://tender-tiger.blogspot.com/2009/02/central-vigilance-commission.html dated 6th Nov, 2008
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
# Guidelines for adoption of Integrity Pact within Government.
To enhance transparency in government procurement, CVC has recommended adoption of Integrity Pact in all PSU except banks in view of their limited procurement. Though it is now optional, CVC recommends that it initiatives should be taken to adopt is & once adopted it should not be discontinued as per order http://www.cvc.nic.in/007vgl0330808.pdf dated 5th August, 2008
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
# Acceptance of Bank Guarantee
Many a times, contractors submit fake/counterfeit Bank Guarantee and Government has no mechanism to check it. To curb this menace, CVC has asked Government to ensure that Banks send them the Original Bank Guarantee Directly through Regd. Post or at least duplicate copy to Government in cases where Original BG is not possible to post as per order dated 1st Jan, 2008 http://cvc.nic.in/010108.pdf
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
# Making Tendering process Mandatory for all Government Organisation
As per CVC award of contract on nomination basis, would amount to a breach of Article 14 of the Constitution guaranteeing right to equality, which implies right to equality to all interested parties and hence it has made Tendering mandatory for all Government Organizations.Only is cases of Natural Calamity, it can be avoided. Refer order no. dated 5th July, 2007 http://cvc.nic.in/OfficeOrderNo23-7-07.pdf
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
# Guidelines as how procurement can be improved in Government
a detailed document is issued by CVC detailing each and every step of Tendering which is available on http://cvc.nic.in/cte_man_2002.pdf
a must read document for all Purchase / Procurement Managers
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
# CVC disallows negotiation with L1
As post tender negotiations could often be a source of corruption, it is
directed that there should be no post-tender negotiations with L-1,
except in certain exceptional situations. To view the order copy click http://cvc.nic.in/005crd012.pdf
Please Visit http://www.TenderTiger.com to view 1 Million Tenders.
Indian Tenders , Indian projects, Indian Supplier Contractor Database, eProcurement
Good Work. I must congratulate you for blogging in this very niche and susceptible area. There are many presumption and assumption in the field of tendering which needs to clarified and very important needs to be openly discussed.
ReplyDeleteKeep Blogging
We have advertised a Tender and received only one tender. Should we go ahead for one tender or we have to readvertise till we receive three
ReplyDeletevk gupta
If you have decided the minimum bid requirement as 3 then you will have to wait for three by extending the date. or else you can open the tender by the approval of concern authority.
Deletecirculars issued from cvc says that in addition to LARs& market rate analysis shuold be taken into account while considering a tender or item wise rate analysis should be done Ltr no. cvc-06-06-d-11-ET-35 Dated:12.06.08, pls suggest that where could i get the copy of this circulars---jp meena, jabalpur
ReplyDeleteBangalore Metro has rejected one of our tenders because the bid bond validity was 180 days in place of the specified 240 days. The validity of the bid itself is specified as 180 days only, however the bond was for an additional 2 months.
ReplyDeleteThis was an oversight and a 60 day extension to the validity was faxed to them on the same evening.
Is Bangalore Metro's action within CVC guidelines?
please provide me the rules to be followed while processing of a single bidder
ReplyDeleteVery Nice effort. it is good to see experts at one platform. Can anyone help me to collect complete guidelines of CVC on tendering.
ReplyDeleteWe have a network service provider whose services we are taking for the last 2 years after going through a tender process. Can we not sign a fresh agreement with the service provider for a period of 2 years without going in for a fresh tender process? Does the CVC allow that? The current service provider has a rate contract with us and for which it was selected through a tender process.
ReplyDeleteSinha
This is a good effort however, will be more useful to consultants if guidlines on negotiations with L-1 is also posted.
ReplyDeleteWe recently were L1 for a project, where we were above technically with a very small margin, the client instead of calling us for negotiations, called L2 for negotiation
what should we do
KK
What is the CVC guideline on extention of rate contract for another 1 year upon last years rates.
ReplyDeleteI would like to start a central supplier for contractor to various state.pliz give me some details and minimum deposit to start.
ReplyDeletethere is a company PACL h.o is in Chd. they never open tender in presence of bidders & call all the bidders for negotiation what should we do against them
ReplyDelete1st phase of a particular work is yet to be completed by the selected vendor.Want to bring new vendor for the second phase of the work to bring competition in executing the work, in the open tendering is ther any way to bar the existing vendor participation.
ReplyDeletepl. reply pammalsubbu@gmail.com
We called limited Tender enquiry from four firms but received only one tender. Should we go ahead for one tender or we have to recall till we receive three please guide w.r.t. govt / CVC rules / guidlines
ReplyDeleteregards,
jbhatia193@gmail.com
after issuance of LOA. the inter-se positon of LI&L2 changes, due to some computation error. what should be done
ReplyDeletesir,
ReplyDeleteis there any guideline for extending the bid opining on request of the prospective bidder
A work has been completed& is under defectliability period. In rains asmall portion of the road has been demaged. Can we award for repaired it from saving of the work after tender process .
ReplyDeleteBP Chauhan
As per CVC guidelines can any person be allowed to participate in any tender process if his/her spouse or near relative is an employee of the same department? Can that person be allowed to submit tender in this is the case?
ReplyDeletecan anyone tell us that can we have the validity of 180 days as it is 90 days...
ReplyDeletecan anyone tell us that can we have the validity of 180 days of CVC tender as it is 90 days...
ReplyDeletehi
ReplyDeletethanks for sharing
http://designersiva.blogspot.com/search/label/tenders
what are the conditions under which limited tenders can be floated, as per CVC guidelines.
ReplyDeleteThere is urgency for appointing service provider for financial inclusion plan. In response to tender only one bid received in spite of two extensions and moderation of eligibility criteria allowed on the basis of queries. Whether decision can be taken on single bid basis as there is no item for re-tendering.
ReplyDeleteMy question is whether a service provider is allowed to provide machinery or other materials on rental that he or his company doesn't own? For instance, if I am in the furniture rental business and start to provide generators on rent that I do not own. Will that be legally allowed? I have observed many people that have been practicing in such a way.
ReplyDeleteAnd if such a guideline exists, what are the penalties associated with it? .
two supliers of same manufacturer can quote in Open Double Bid Tender ?(favoring to one manufacturer only)
ReplyDeletewhat happens in case of only two bidders technically qualified and the quote of L1 is very much below the bench mark of the quote.
ReplyDeletewhat is limit of turnover?
ReplyDeleteAverage Annual financial turnover during the last 3 years, ending 31st
DeleteMarch of the previous financial year, should be at least 30% of the
estimated cost.
Pls tell me it's total turnover of last three years or turnover annually 30%
DeleteIt's average of 3 years like (20%+30%+40%)/3=30%
Deletegood aftrenoon.Please tell me whats procudres can followed in case of proprietory items.
ReplyDeleteI am manish hansoti from Ahmedabad. My questions to all experts for Maximum penalty can be obtained by tenderer is there any guidelines and when it was given by CVC.
ReplyDeleteIn case of e procurement and global tender if crieteria for sales turnover kept high like 10 crore average in last three years to qualify only specific companies as L1 and L2 Now only two companies are qualified so with two bidders qualifications PSU can open financial bid as tender will be given as 6% to L1 and 40% to L2 so it is malafied practice is seen in that tender what to do as we are disqualified due to 20Lacs short in Turnover.
ReplyDeleteSir I may kindly be informed whether QCBS method of evaluation of tender is permitted by CVC guidelines. Also the criteria for fixing the annual average turn over in the preceeding years and experience of undertaking similar work with what value.
ReplyDeleteMy e-mail address: mandalbabul@yahoo.co.in
with regards,
Babul Mandal
Sir I may kindly be informed whether QCBS method of evaluation of tender is permitted by CVC guidelines. Also the criteria for fixing the annual average turn over in the preceeding years and experience of undertaking similar work with what value.
ReplyDeleteMy e-mail address: jsanjayjain44@yahoo.com
Sir,
ReplyDeleteWe M/S kamadhenu Outsourcing, Anantapur (A.P) humbly request you kindly intimate the turnover percentage on estimated cost in outsourcing works (in manpower supply works) Are there any guidelines and prepared circulars in this regard. Kindly intimate us at once.Kindly treat it as most urgent.
Yours faithfully,
Managing Partner,
M/s Kamadhenu outsourcing
Anantapur (A.P)
ph; 08554-270940
099855 88678
Sir,
ReplyDeleteWe M/S kamadhenu Outsourcing, Anantapur (A.P) humbly request you kindly intimate the turnover percentage on estimated cost in outsourcing works (in manpower supply works) Are there any guidelines and prepared circulars in this regard. Kindly intimate us at once.Kindly treat it as most urgent.
Yours faithfully,
Managing Partner,
M/s Kamadhenu outsourcing
Anantapur (A.P)
ph; 08554-270940
099855 88678
My Mail:kamadhenu.out@gmail.com
We are a software development company. When we went to receive a blank tender from one of the nagarpalika - muncipal corporation- They refused to issue the tender. When we asked they did not have proper answer. I want to know can they refuse to issue a blank tender to anyone? Can we say this a transparent tendering process. If they can not do so how Indian law will help me?
ReplyDeleteCVC guideline for manpower outsourcing by tender in PSU
ReplyDeleteWHAT ARE THE GUIDELINES FOR A PSU AS A BIDDER FOR PARTICIPATION IN A GOVERNMENT TENDER. IS THERE ANY SPECIFIC GUIDELINES? IF SO, PLEASE ENLIGHTEN.
ReplyDeleteGet detailed information on Indian Tenders, TenderNews provides access to all type of online tenders from India including government tenders, corporate tenders, tender India, public tenders, procurement notices.
ReplyDeleteOne tender after paper notification in local news paper, the repose was very poor , only one tender was received , what will be its fate? award or re-tender , estimate value 12.0 lac.
ReplyDeletegood morning to all..My query is: Are negotiations permissable in ad-hoc contracts?
ReplyDeleteWe have two different companies and applied tenders for purchase of building and we selected the highest bidder in that tender. I want to now that there is any rule regarding director, because in both the companies some persons are director in both the companies. Is it affect anyway for that tender.
ReplyDeleteplease tell me the CVC guideline on similar nature of works for civil engineering jobs.
ReplyDeleteWhat should I do if the following happens:
ReplyDelete1. I have got party A as L1 in a tender
2. If I consider VAT credits that I can take for the goods supplied by L2, then the Lowest value becomes that of L2 instead of L1.
3. While the same product is quoted by L1 & L2, the rates of L1 & L2 differ largely.
-- Suresh
thanks for the post.hope you have new up to date tenders related to this category . and you have a nice site about online tenders . appreciate your work
ReplyDeleteour organisation had floated a tender for construction of a building...one of the participants have applied as joint venture with one participant fullfilling all the conditions of the contract and the other 50%....the tender document was silent with regard to acceptance of joint venture...
ReplyDeletecan we qualify the joint venture firm in this case..?
In one tender floated by Govt. Of Rajasthan, where total bid received was 5 (Bidders), out of that only 1(One) Bidder is Technically Qualified. Where in tender documents it is written Envelop A, Envelop B and to be submitted Physical all the Documents apart from Price Bid. But they didnt accept any Physical Documents and they just took EMD and Other Undertaking Documents. After seeing one bidder is qualified they immediately opened its price bid. Is it possible to open Price bid after having only one technical bidder? Kindly guide me for this.
ReplyDeleteplz tell me the CVC tender NIT guidline
ReplyDeleteYours faithfully,
Md Anis Ahmed Ansari,
M/s Allied Electric Works
Main Road Singrauli
(MP) 486889
Email Id: mdmojahidr@gmail.com
Contact No : 9826621239,9425855236
SIR, IS THERE ANY GUIDELINES THAT IF THREE TENDERS ARE RECEIVED THEN IT SHOULD WORK AND THERE IS NO NEED FOR RE-TENDERING
ReplyDeletePLEASE TELL
In a state govt tender whether 2 tenders who are technically qualified the L1 can be awarded the contract.pl confirm. Kishore.
ReplyDeleteTenders have created a special niche for themselves within the company world. The business organizations currently wish to take tenders for his or her business activities. Everyday there ar several tenders being floated by varied corporations, and range of customer bid for these tenders.
ReplyDeleteOnline Tenders Services
all guidelines are there still it is fact corruption is increasing day by day in Tendering Process. there are many steps needs to be taken to stop corruption from tendering Process. First we should increase competition in Tender invitation. when more and more bidder participating in Tenders new Player come, resulted in good price. to increase competition, there should be a site like www.tenderdetail.com where information are free for bidders.
ReplyDeleteI am R S MANI, Director, Gemini Graaphics P. Limited, Bidar, having a IBA_RBI approved S ecurity Printing Press and Security Paper Mill of our own, at Bidar in Karnataka. URL www.geminigraphicsindia.com
ReplyDeleteRaiv Gandhi Jeevandayee Arogya Yojana Society, Ganpat Jadhav Marg, Mumbai 400018 phone no.022 24912291 have floated a tender for supply of health cards but the tender is restricted to Companies Registered at Maharashtra with its factory location also in Maharashtra.
As far as I know this condition infringes the article 14 of the Constitution which gives equality of position to all the tenderers, and no Government can restrict the tender to a particular State. Please give me your considered opinion on this subject.
I have a small query. If L1 has gone 20% below the estimated price than is there any provision that the tendering authority can divert the work to L2. As this price (Below 20%) is not possible.
ReplyDeleteI have the same question
DeleteDear Sir
ReplyDelete1. The following is the case in the Govt tender
(a) Pubic Tender Notice Issued in TWO bid system
(b) Parties are submitted the tenders and L1 identified.
(c) PNC conducted
(d) Work order Placed on the L1 party for the Negotiated price.
(e) Before commencement of the work by L1 party, the L1 party identified the ground position of the
equipment and the tendered scope of work having a lot of variation.
(f) Intimated the same to the Customer reg the scope variation.
(g) The complete argument has started for this stage. They were stated that the GA drawing mentioned in
the tender will cover the additional scope of work.
(h) As they were argued the same has not been covered in the drawing and further the connected
drawing No are also not mentioned in the tender as well as in the Work Order.
(i) How the additional drawings are the part of the tender or in the part of Work Order --- Pl Clarify the
same is as per the CVC guidelines.
(j) Since we are opposing the same, they were issued a notice to us and going for Limited tender.
(k) Since the tender value is more than 25 lakhs -- the limited tender is a correct procedure as per the
guidelines of CVC.
2. Kindly guide us for the above case.
If any further clarification pl feel free to contact us.
Regards
RAM MURTHY
Mobile : 9440594150
1. If in SOW the work has been mentioned and diagram/sketch has been not provided still authority can provide diagram/sketch at later stage. It is recommended to resolve such thing during Pre-bid meeting alongwith written clarification.
DeleteFor Example if SOW include erection of tower and specification of tower is provided but diagram/sketch are missing is your duty to ask authority that bidder will suggested tower are acceptable or authority have specific diagram for the same.
2. As per CVC guidelines authorities can float limited tender for procurement of abv 10 Lakhs on special approval and also it vary from case to case bases
Whether JV can be permitted in Turn Key Projects of PHED Rajasthan
ReplyDeletePungliasanjay@gmail.com
Hey Admin thanks for the post i was looking for a blog about online traders . and this post provided all i needed to know about tenders .appreciate your work ..
ReplyDeletetenders online & government tenders
Dear Sir,
ReplyDeleteWe stood L1 for 2 consecutive e-procurement tenders for the same tender called by a Govt organisation.
As there was more than 50% difference with the prices with there estimated prices(which they arrived themselves, without getting any quotations from the market)they have cancelled the tenders.
Inspite of participating in the most transparent platform of tender calling and paying the processing and also the eprocurement fee both the times,i lost the tender.
Is there any possiblity to challenge the cancellation of the e-tenders and get the order.
Please advice asap.
Thanks
With Warm Regards,
Pavan Kumar Gande
Hyderabad
+91 9849544550
Dear Sir,
ReplyDeleteWe stood L1 for 2 consecutive e-procurement tenders for the same tender called by a Govt organisation.
As there was more than 50% difference with the prices with there estimated prices(which they arrived themselves, without getting any quotations from the market)they have cancelled the tenders.
Inspite of participating in the most transparent platform of tender calling and paying the processing and also the eprocurement fee both the times,i lost the tender.
Is there any possiblity to challenge the cancellation of the e-tenders and get the order.
Please advice asap.
Thanks
With Warm Regards,
Pavan Kumar Gande
Hyderabad
+91 9849544550
No, Department have alrights to scrap the tender at any stage without providing any reason for the same.
DeleteYou provide great information about Tenders, we have large database of Tenders source and great offer in Tender.
ReplyDeleteThanks.
Tenders in Delhi
Please send me eligibility criteria of past experience and financial standing as per CVC guidelines / norms
ReplyDeletewe have received three bid for technical evaluation but among them only single bid is responsive this responsive bid is valid tender.
ReplyDeleteIf its is Two Stage bidding then tender supposed to be scrap, as in two stage bidding atleast two company should be qualify for financial evaluation
DeleteDear Mr. Sandeep Mishra. Thanks for your valuable post. Can you send me the notification from CVC guidelines of the same rule which you mentioned above. We are facing the same situation but we have qualified two financial bids. In order to go ahead we need the circular of the govt which states this rule which you mentioned above. Kindly forward me the document.
DeletePlease mail on work.piyushk@gmail.com. I will be waiting for your response.
Hello.piyush
DeleteI was just going thru the posts. I am in a situation as the only bidder to be qualified for financial evaluation in an open tender. The PSU is hard pushing for nego and threatening to retender if we don't offer huge discount. Is there any CVC guideline to safeguard in the situation only 1 bidder qualifies for financial evaluation
For "If its is Two Stage bidding then tender supposed to be scrap, as in two stage bidding atleast two company should be qualify for financial evaluation" please share CVC guidelines
Deletewith in how many days the tender must be finalized after due date
ReplyDeletesathyanarayana
sathyanarayanaalfa@gmail.com
09246812248
Its completely depend upon department to department, urgency of procurement, and evaluation time they took for the procurement. Further the bid validity can give you the idea of tentative time of the result. However, department may ask for the extension on Bid validity too..
DeleteSeating World India has always been the first choice of Corporate companies when it comes to Corporate Furniture Systems In India. Seating World started off as one of the first dealers of imported furniture in Hyderabad. Contact us now! 040-66667642.
ReplyDeleteCorporate Furniture Systems
This is very useful important information,,,, Thanks for sharing this information,,,
ReplyDeleteE-Procurement Services Bangalore
Vendor and Contract Management System
Expense Management system India
One of the state govt tenderer has asked 1cr mim turnover (each Year)for the last 3 consecutive years for a order value about 1cr.Is that correct according to the CVC guidelines.
ReplyDeletePavan
Hyderabad
Corporate Business Support Solutions , one of the leading Business Process Outsourcing Companies in India, provides comprehensive business process outsourcing and IT Staff Outsourcing Services delhi
ReplyDeleteI have a small query. If L1 has gone 20% below the estimated price than is there any provision that the tendering authority can divert the work to L2. As this price (Below 20%) is not possible.
ReplyDeletewhat happens if we fails to start the project or work at the position of L1
ReplyDeletehello friends. We recently invited tenders. In response, 03 agencies responded but two bids who have quoted Lowest Rates found to be conditional. Hence rejected. Meanwhile, su moto third agency given offer to work on L-1 rates. 3rd agencies is a PSU. What to do...should we go for retender or award the job to PSU without taking into account his su moto offer.
ReplyDeleteif l1 not satisfied condition due to error can we call for l2
ReplyDeleteWhat is the CVC guidelines on Validity of Award of Contract to same firm without any fresh tender?
ReplyDeleteManpower agency service charge any notification related 2% or less then (minimum service charge )
ReplyDeleteManpower agency service charge any notification related 2% or less then (minimum service charge )
ReplyDeleteDear Sir
ReplyDeleteWhen only one tenderer is qualified during techno commercial evaluation, whether financial bid can be opened
Furniture Tenders In Andaman And Nicobar | Andhra Pradesh | Arunachal Pradesh | Assam | Bihar | Chandigarh-UT | Chhattisgarh | Delhi | Goa | Gujarat | Haryana | Himachal Pradesh | Jammu And Kashmir | Jharkhand | Karnataka | Kerala | Madhya Pradesh | Maharashtra | Manipur | Meghalaya | Mizoram | Multi State | Nagaland | Orissa | Punjab | Rajasthan | Sikkim | Tamil Nadu | Telangana | Tripura | Uttar Pradesh | Uttarakhand | West Bengal |
ReplyDeleteNice Blog
ReplyDelete(1) Special Repair To Mag And Convent Road Including Road Side Furniture At Bhopal.(2) Repair And Maintenance Of Certain Items Of Steel Furniture At Mhow. (3) Supply Of Hostel Furniture (Cots And Dinning Tables For Hostel) At Indore. (4) Supply Of Furniture Items At Tekanpur Gwalior. (5) Special Repair Renewal Of Steel Wooden Furniture Against Surveyed Off Furniture At Jabalpur. Madhya Pradesh
Nice to meet you
ReplyDeleteInterior, Furniture, Painting, False Ceiling, Flooring, Tiles, Waterproofing, Design, Contractor In Ahmedabad
I'd truly love to be a piece of gathering where I can get exhortation from other experienced individuals that have the same interest. In the event that you have any suggestions, please let me know. Much obliged to you!
ReplyDeleteBuy perfectmoney with PayPal
It's amazing to your sympathetic wife that's prepared to keep up your falter morale every time in your life! You do have such an interesting blog. Thank you!
ReplyDelete----------------------
Finance software
In fact programming is nothing however it’s a logic, if you get control on it afterward you are the professional else nothing.Réparation android
ReplyDeleteI found this blog really helpful. To get more details about Civil Construction Contractors you can go to that website
ReplyDeletepse elaborate CVC guidelines under which an open tender which comes in single tender situation to be dealt. pse treat urgent
ReplyDeleteThat was a great message in my carrier, and It's wonderful commands like mind relaxes with understand words of knowledge by information's.
ReplyDeleteManpower Services in Chennai
ReplyDeleteThis is very useful to me
Turnkey Interior Contractors Chennai
Dear sir
ReplyDeletewe are a computer firm.we submit a quatation for server and its very lowest.2nd part's quate vey highest than me. but the govt: office ask negiciation for both.is it a legal pcedure? or not
is it a legal santity?
Dear sir
ReplyDeletewe are a computer firm.we submit a quatation for server and its very lowest.2nd part's quate vey highest than me. but the govt: office ask negiciation for both.is it a legal pcedure? or not
is it a legal santity?
What if just one bid qualify after financial evaluation
ReplyDeleteIn one of the replies, it's written that minimum criteria for annual sales is 30% of the estimated cost. My query is:
ReplyDeletea) Whether there's a maximum limit to the annual turnover in relation to the estimated cost?
b) Whether it's mandatory to mention estimated cost in the tender document at all?
http://www.usasportsleaks.com/2017/06/17/pakistan-vs-india-final-ct17-stream-scorecard/
ReplyDeleteI find lots of interesting queries on practical situations but there are no replies or solutions. Replies to the queries from experts should also posted for the benefit of the persons raising the issues as well as for the visitors to the site.
ReplyDeleteThis comment has been removed by the author.
ReplyDeletedigital marketting company surat http://www.appyify.com
ReplyDeleteIf L1 party backs out, under what circumstances L2 party can be asked to match L1 prices?
ReplyDeletenice post thanks for sharing
ReplyDeleteUltrasonic tenders
Ultrasonic tenders
Ultrasonic tenders
Ultrasonic tenders
Ultrasonic tenders
What is the minimum service or administrative charges in case of a security agency tender
ReplyDeleteis there any cvc guideline for treating the tenderer as unresponsive, as many tenderers quote very less service or administrative charges to grab the tender
ReplyDeleteLoan Opportunity Offered By Mr, Benjamin That Save My Family From Financial Bondage { 247officedept@gmail.com }
ReplyDeleteHello Everyone, I am Putri Adiratnaa single mom from Jakarta, I would like to share this great testimony on how I got a loan from Mr, Benjamin, when we were driven out of our home when I couldn't pay my bills anymore, After being scammed by various companies online and denied a loan from my bank and some other credit union I visited. My children were taken by the foster care, I was all alone in the street. The day i shamefully walked into an old school mate who introduced me to Daisy Maureen. At first I told her that I am not ready to take any risk of requesting a loan online anymore, but she assured me that I will receive my loan from them. On a second thought, due to my homelessness I had to take a trial and applied for the loan, luckily for me I received a loan of $80,000.00 from Mr, Benjamin. I'm happy I took the risk and applied for the loan. My kids have been given back to me and now I own a home and a business of my own. All thanks and gratitude goes to the help of Mr, Benjamin for giving me a meaning to life when i had lost all hope. If you currently seeking for a loan assistance, you can contact them via: {247officedept@gmail.com WhatsApp +1-989-394-3740.
I use this Article to show my assignment in college.it is useful For me Great Work.For More Info.delhi eprocurement
ReplyDeleteThanks for Sharing This useful Information.
ReplyDeleteTop Construction Companies In Gurgaon
These ways are very simple and very much useful, as a beginner level these helped me a lot thanks fore sharing these kinds of useful and knowledgeable information.
ReplyDeleteProcurement Management Software
Procurement Management Software India
Procurement Management System
i always follow your blogs for tenders. It is really helpful for us! keep updating always!
ReplyDelete2bhk flats near thakurpukur
Hello! Great article and thank You for Providing Such a Unique and valuable information on The Tenders Pedia for your readers. I really appreciate it. You can also visit security tenders for more Tenders Pedia related information and knowledge.
ReplyDeleteThanks for the information
ReplyDeleteYou can also check the below
https://www.rootbites.com/product-category/ghee/